Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Worklog Breakdown Export

Purpose:

The Worklog Breakdown export offers a granular, line-by-line view of your project's cost and time tracking data. Each row in the export represents a single worklog author entry, regardless of whether multiple worklogs are associated with the same Jira issue.

...

How to Export:

  1. Navigate to your desired Cost Report.

    Знімок екрана 2024-07-02 о 14.36.05.pngImage Added

  2. Click on the "Scope" tab.

  3. Locate the Export icon

  4. Select "Worklog Breakdown" from the available export options.

    Знімок екрана 2024-07-02 о 14.38.52.pngImage Added

  5. Your detailed worklog report will be downloaded in .XLSX format.

    ezgif.com-video-to-gif-converter (1).gifImage Added

Issue Totals Export

Purpose:

The Issue Totals export provides a high-level summary of your project's time tracking data at the issue level. Each row in the export corresponds to a single Jira issue, aggregating the total time spent and associated cost across all worklogs for that issue.

...

How to Export:

  1. Navigate to your desired Cost Report.

    Знімок екрана 2024-07-02 о 14.36.05.pngImage Added
  2. Click on the "Scope" tab.

  3. Locate the Export icon

  4. Select "Issue Totals" from the available export options.

    Знімок екрана 2024-07-02 о 14.38.52.pngImage Added
  5. Your detailed worklog report will be downloaded in .XLSX format.