Do you want to calculate how long a task has been 's length without an Assignee? Set up an SLA condition that will start somehow when the Assignee is changed, Moved from Assigned to Unassigned, and vice versa. How can you do this?
1. Click the ‘SLA Configuration’ “SLA Manager” button at in the top-right corner.
...
2. Select a drop-down list for Start conditions and choose an Assignee as a criteria.
...
After, select a the “from Issue Unassigned” option
...
3. For the Stop condition, select an “ Assignee “Assignee Changed” option (event even when the task has received an Assignee) or another option you need.
...
You can also set the conditions for Start, Pause and End of the SLA with the Assignee field according to the following criteria:
...
Set a “0h” Goal to count how long the task was unassigned. Save the configuration, and then you can monitor the time the task was unassigned, which will be calculated in the reverse order (as “-10m, -22m, -1h, -2h, -3h 10m” etc.).
...
The result will be available on the Table grid. And now you can monitor how much time is counted as “Unassigned.”
...